PREPARATION BEFORE THE INSTALLATION

Every project is well prepared before construction

Personnel Arrangement

Organize construction and management personnel

Material Delivery

Prepare the required materials, count and conduct preliminary inspection

Technical Explanation

Provide technical explanation and training to construction personnel

Safety Measures

Establish safety measures to prevent accidents

Crawling Material


The climbing net uses a marine cable with a diameter of 14mm, a core of 1 strand of hot-dip galvanized steel wire, a rubber hose and plastic coating, and complies with the national standard GB/T8834-2006. There is no broken wire in the rope body and no loose wire at the rope end.

Main Support Column


The main support column adopts Φ500, 325, 275 galvanized pipe with wall thickness ≥5.0mm, and the auxiliary support pipe adopts Φ175 wall pipe ≥5.0mm and the auxiliary pipe Φ127 with wall thickness ≥5.0mm, which meets the requirements of GB/T13793-2008, with high steel content, good load-bearing capacity and high safety.

welding

VIEW MORE

Three coats of primer for steel pipe anti-rust treatment

VIEW MORE

Welding details display

VIEW MORE

Foundation Construction

The embedded foundation is constructed strictly according to the drawing

The embedded foundation is constructed strictly according to the drawing

Equipment foundation construction
FEATURED PROJECTS

Construction Technology Display

Construction Technology Display

Construction Technology Display

Construction Technology Display

Construction Technology Display

Construction Technology Display

Construction Technology Display

REQUEST MORE DETAILS

Please fill out the form below and click the button to request more information about
FirstName*
LastName*
Email*
Tell*
Message*
Application market
More Requirements
If you have site CAD drawings or other site information, please send them to us.